State Highway Construction 6/14 to 6/20

The following is a summary of road construction and maintenance scheduled on state highways around Mason County and adjacent areas from June 14, 2020 to June 20, 2020 .

US 101 – Coffee Creek – Remove Fish Barrier
Highway: US 101 Region: Olympic County: Mason Location: Milepost(s) 346.8
Description:  Crews are building a new alignment for Coffee Creek as part of a WSDOT fish barrier removal project. 
Work Schedule: See below:

Shelton-Matlock Road 

  • Travelers on Shelton-Matlock Road approaching US 101 are using a temporary two-lane bypass road around the work zone. Travelers can expect a reduced speed limit to 25 mph and occasional traffic stops of up to 15 minutes during work hours, 6 a.m. to 8 p.m.
  • The bypass road will allow crews to build a new stream channel and install an approximately 96-foot-long box culvert to eventually connect a realigned Coffee Creek under the Shelton-Matlock Road. The channel will link to a replicated natural streambed, which was previously built between Shelton-Matlock Road and the area approaching Goldsborough Creek.
  • ?Crews expect to fully reopen the Shelton-Matlock Road by mid-summer. 

Highway: SR 106 Region: Olympic County: Mason Location: Milepost(s) 11.5 to 19
Description: One-way alternating traffic for utility work. 
Work Schedule: 9 a.m. until 3 p.m. each Monday through Thursday, from Monday, June 15 to Thursday, July 30.

Highway: SR 119 Region: Olympic County: Mason Location: Milepost(s) 5.8 
Description: One-way alternating traffic for utility work. 
Work Schedule: 11:30 p.m. Saturday, June 13 to 8 a.m. Sunday, June 14. 

Highway: US 101 Region: Olympic County: Thurston Location: Milepost(s) 367
Description: Southbound US 101 on-ramp to southbound I-5 will close for crack sealing. Travelers will detour via northbound I-5, Port of Olympia/Henderson Boulevard and southbound I-5.
Work Schedule: 9 p.m. Sunday, June 14 to 5 a.m. the following day.

Highway: US 101 Region: Olympic County: Thurston Location: Milepost(s) 364
Description: Southbound shoulder closures for crack sealing. 
Work Schedule: 9:30 a.m. until 3:30 p.m. Monday through Thursday, June, 15-18. 

Highway: US 101 Region: Olympic County: Thurston Location: Milepost(s) 364.8 to 362.1
Description: Northbound left lane closure for crack sealing. 
Work Schedule: 10:30 p.m. Wednesday, June 17 to 4:30 a.m. June, Thursday 18. 

Highway: US 101 Region: Olympic County: Thurston Location: Milepost(s) 362 to 367
Description: Shoulder closures in both directions for graffiti removal. 
Work Schedule: 6:30 a.m. until 5 p.m. Monday through Thursday, June 15-18.

Highway: US 101 Region: Olympic County: Thurston Location: Milepost(s) 362 to 364
Description: Southbound single lane closure for crack sealing.
Work Schedule: 9 p.m. Monday, June 15 to 5 a.m. June, 16.

Highway: SR 3 Region: Olympic County: Kitsap Location: Milepost(s) 43.5 – 43.2
Description: Southbound shoulder closure for crack sealing. 
Work Schedule:   7:30 a.m. until 3:30 p.m. Tuesday and Wednesday, June 16-17.

SR 302 – E of Elgin Clifton Rd to SR 16 – Remove Fish Barriers, Paving and ADA Compliance
Highway: 302 Region: Olympic County: Pierce Location: Milepost(s) 10.8 to 16.9
Description: This project removes and replaces three outdated culverts under SR 302 with fish passable structures, repaves 8 miles of SR 302, and rebuilds sidewalks and ramps at the intersections of SR 302 and SR 302 (Spur) through SR 302 and 94th Avenue to comply with the Americans with Disability Act and improve access for all travelers. Drivers can expect up to three weekend closures of the SR 302 Purdy Spit for bridge deck repairs scheduled for summer 2020. The bridge deck work will take place day and night. A signed detour will be in place during construction. Paving and deck repairs will require warm, dry weather conditions. Paving operations will occur overnight, when traffic volumes are less.
Work Schedule: Speed limit through the work zone is 25 mph. Drivers will see weekday, daytime construction as crews build the bridge at Minter Creek. 

Beginning Monday, June 8, crews will conduct overnight pavement repairs along a one-mile stretch of SR 302 between 150th Ave. NW and 138th Ave. NW during the following times:

  • Monday, June 8 and Wednesday, June 10 – Saturday, June 13
    • Each night from 8 p.m. to 6 a.m. each following day. 
    • No work is scheduled for the night of Tuesday, June 9.

During paving operations, the highway will reduced to a single lane of alternating traffic controlled by flaggers. All work is weather dependent and could be rescheduled.

Highway: SR 302 Region: Olympic County: Pierce Location: Milepost(s) 5.9
Comments: Utility company is installing phone service to a customer. Intermitent one-way alternating traffic as needed.
Work Schedule: Each day from 8 a.m. to 4:30 p.m., Tuesday, June 16 to Friday, June 19.