Warning: Use of undefined constant banner_admin_init - assumed 'banner_admin_init' (this will throw an Error in a future version of PHP) in /home/masonw5/public_html/wp-content/plugins/wp-banner/banner.php on line 313

Warning: Use of undefined constant banner_admin_scripts - assumed 'banner_admin_scripts' (this will throw an Error in a future version of PHP) in /home/masonw5/public_html/wp-content/plugins/wp-banner/banner.php on line 459

Warning: Use of undefined constant banner_admin_menu - assumed 'banner_admin_menu' (this will throw an Error in a future version of PHP) in /home/masonw5/public_html/wp-content/plugins/wp-banner/banner.php on line 480

Warning: Declaration of FDX_Widget_profile::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/masonw5/public_html/wp-content/plugins/wp-twitter/modules/class-p2.php on line 26

Warning: Declaration of FDX_Widget_profile::form() should be compatible with WP_Widget::form($instance) in /home/masonw5/public_html/wp-content/plugins/wp-twitter/modules/class-p2.php on line 26

Warning: Declaration of FDX_Widget_search::widget($args) should be compatible with WP_Widget::widget($args, $instance) in /home/masonw5/public_html/wp-content/plugins/wp-twitter/modules/class-p2.php on line 50

Warning: Declaration of FDX_Widget_search::form() should be compatible with WP_Widget::form($instance) in /home/masonw5/public_html/wp-content/plugins/wp-twitter/modules/class-p2.php on line 50
State Highway Construction 3/8 to 3/14 – MasonWebTV.com

State Highway Construction 3/8 to 3/14


Warning: sizeof(): Parameter must be an array or an object that implements Countable in /home/masonw5/public_html/wp-content/plugins/wp-banner/banner.php on line 270

The following is a summary of road construction and maintenance scheduled on state highways around Mason County and adjacent areas from March 8, 2020 to March 14, 2020.

US 101 – Coffee Creek – Remove Fish Barrier
Highway: US 101 Region: Olympic County: Mason Location: Milepost(s) 346.8
Description:  Both the southbound US 101 exit to Shelton-Matlock Road and the Shelton-Matlock Road on-ramp to southbound US 101 are closed until 5 a.m. Monday, March 2. When completed, crews will open both new ramps to create a more traditional diamond interchange.
Work Schedule: See below:

US 101 – 8 p.m. Wednesday, and Thursday, March 11-12 to 6 a.m. each following day and 9 p.m. Friday, March 13 to 8 a.m. the following day.
Both the southbound US 101 exit to Shelton-Matlock Road and the Shelton-Matlock Road on-ramp to southbound US 101 will close. A signed detour will be in place.

Shelton-Matlock Road – 6 a.m. to 8 p.m. each weekday 
Brief traffic stops and shoulder closures on Shelton-Matlock Road approaching US 101 interchange.

Highway: SR 108 Region: Olympic County: Mason Location: Milepost(s) 4.9 to 9.7
Description: One-way alternating traffic for Mason County PUD #3 power pole replacement. 
Work Schedule: 9 a.m. to 4 p.m. each weekday through Tuesday, March 31.

Highway: SR 3 Region: Olympic County: Kitsap Location: Milepost(s) 37.5 to 37.6
Description: Southbound shoulder closure with shifted lanes for guardrail enhancement. 
Work Schedule: 10 a.m. to 2 p.m. Monday, March 9.

Highway: SR 104 Region: Olympic County: Kitsap Location: Milepost(s) 13.9
Description: Drivers are strongly encouraged to plan ahead for eight nights when the SR 104 Hood Canal Bridge will close to all traffic for 5 continuous hours. The closures allow crews to complete repairs on key elements of the bridge. The work is weather dependent and could be rescheduled. 
Work Schedule: See below: 

  • Monday, March 9 to Thursday, March 12 each night from 10 p.m. to 3 a.m.
  • Monday, March 16 to Thursday, March 19 from 10 p.m. to 3 a.m.

SR 302 – E of Elgin Clifton Rd to SR 16 – Remove Fish Barriers, Paving and ADA Compliance
Highway: 302 Region: Olympic County: Pierce Location: Milepost(s) 10.8 to 16.9
Description: This project removes and replaces three outdated culverts under SR 302 with fish passable structures, repaves 8 miles of SR 302, and rebuilds sidewalks and ramps at the intersections of SR 302 and SR 302 (Spur) through SR 302 and 94th Avenue to comply with the Americans with Disability Act and improve access for all travelers. Drivers can expect up to three weekend closures of the SR 302 Purdy Spit for bridge deck repairs scheduled for summer 2020. The bridge deck work will take place day and night. A signed detour will be in place during construction. Paving and deck repairs will require warm, dry weather conditions. Paving operations will occur overnight, when traffic volumes are less.
Work Schedule: A temporary detour road around the work zone is now open. Speed limit through the work zone is 25 mph. Drivers will see weekday, daytime construction as crews build the bridge at Minter Creek. Any road closures will be announced in advance.

Highway: SR 302 Region: Olympic County: Pierce Location: Milepost(s) 12.6 – 12.9
Description: Utility contractor is installing a communications line along the shoulder of a section of SR 302. The shoulder will close.
Work Schedule: Feb. 24 through March 6 from 8 a.m. to 4:30 p.m.